When an agency says a deliverable is approved, it should be able to answer four questions: Which version? Approved by whom? On what date? Approved for what action? A reusable tracker can capture those answers even when the actual review happens in a document or proofing tool.

The download is a CSV file with a ten-column header row and three blank rows. The worked example on this page shows what a filled tracker looks like; the file you download is empty so you can start from your own assets.

Copy the table below into your project system. It is designed for a small team that produces website copy, social posts, designs, or reports. You can use it without buying approval software; if the number of review rounds grows, it also helps you test whether a product solves a real problem.

What is in the download

The file is client-approval-tracker.csv, version 1.0.

Scroll horizontally to see every column.
File detail What you get
Format Comma-separated values, UTF-8, with a single header row
Columns Asset ID, Deliverable, Version, Agency owner, Client approver, Review due, Status, Decision date, Decision evidence, Next action
Rows The header plus three blank rows; the sample rows on this page are illustrative and are not in the file
Opens in Excel, Google Sheets, Numbers, Airtable or any text editor; no formulas or validation rules are included
Not included Permissions, notifications and version history. Those come from the tool you import the file into, not from the CSV.

If your team does not use a spreadsheet, the same ten columns work as fields in a project database or as a form in your project tool.

Define the approval path first

Before sharing any draft, name one agency owner and one final client approver. If the client needs internal legal or brand review, record that step and its owner too. Decide whether a client comment means “feedback received” or an actual approval. These are different outcomes.

For a two-stage process:

  1. Agency reviewer checks accuracy, scope, and completeness.
  2. Client approver reviews the version released to them.
  3. Agency records the decision and, if needed, creates a new version.

Do not publish, schedule, or deliver a changed version under an approval granted to an older one. If the change is purely typographic and your agreement allows it, record the exception. Otherwise request approval again.

Copy the tracker

The example below uses a fictional client and fictional dates. The Asset ID remains stable, while each substantive revision gets a new Version and review record.

Scroll horizontally to see every column.
Asset ID Deliverable Version Agency owner Client approver Review due Status Decision date Decision evidence Next action
ACME-HOME-01 Homepage hero copy v1 Jordan Sam Nov 12 Changes requested Nov 12 Review thread #1 Revise headline
ACME-HOME-01 Homepage hero copy v2 Jordan Sam Nov 15 Approved Nov 14 Approval message on v2 Publish v2
ACME-SOC-01 Social post and image v1 Taylor Sam Nov 18 In client review — Review link Follow up Nov 18

Never reuse v1 for an edited file after the client has reviewed it. A version label, stable file URL or revision ID, and dated decision make it possible to reconstruct what was approved.

Use a short status list: Draft, Agency review, Client review, Changes requested, Approved, Published, and Blocked. “Sent” is an event, not an approval status. A Blocked item needs an owner and the missing decision or asset written in Next action.

Edit these six fields before the first review

  1. Asset ID. Use a client prefix and a deliverable number, such as ACME-HOME-01. The ID stays the same across versions.
  2. Version. Start at v1 and add a new row for every substantive change. Never edit a row after the client has reviewed it.
  3. Agency owner and client approver. Role names are not enough; name the person authorized to approve this deliverable.
  4. Review due. Include a date and, if the client is in another timezone, the timezone. “Friday” is ambiguous.
  5. Decision evidence. Link the message, comment thread or signed note that records the decision. This is the column that answers “approved by whom?” later.
  6. Scope of the approval. Use Next action to say what the approval covers, such as “Approved for website publication” or “Approved for ads only.” An approval for one channel is not an approval for every channel.

Set a review request the client can answer

Here is a message you can adapt:

Please review Homepage hero copy, v2 at [review link] by [date and timezone]. The current decision is on the headline and button text. Add comments at the linked version. Reply “Approved for website publication: v2” if no changes are needed. If another person must approve it, tell us who and when they can review.

The client should not have to search through past attachments to find the current file. Keep one review link associated with the version in the tracker. If a tool replaces the file at the same URL, confirm that the version history and decision still refer to the exact content the approver saw.

Handle changes and silence

When the client requests a change, log the request against the reviewed version, assign an owner, and produce a new version. Decide whether the revision changes scope or delivery date; if it does, get an explicit decision before promising the original timeline.

If the review deadline passes without a response, send a reminder that identifies the asset and remaining decision. Request an explicit decision; follow the agreement and applicable rules when a response is late. A final approver who is away may require a new date or a delegate with authority.

Measure the delay without blaming the client

Track the time from first review request to first response, number of review rounds, time between feedback and revised version, and percentage of items approved by the agreed date. These are internal measures. Do not claim an improvement until you have a baseline and actual results.

Look for patterns. A long client review may reflect an unclear request, too many approvers, or a deliverable that did not match the brief. Fix the cause before sending more automatic reminders.

When is software useful?

If you produce a few text deliverables monthly, a shared document plus this tracker can suffice. If clients review visual files, video, or many versions, a dedicated approval system may make comments and approvals easier to locate. If approval happens inside repeat client requests, evaluate whether a client portal provides an appropriate decision record.

Trial any shortlisted tool with the same fictional asset: submit v1, request a change, submit v2, approve v2, and attempt a later edit. Check whether permissions and the recorded decision behave the way your agreement requires. Vendor documentation can describe a feature; only your test confirms the workflow you plan to use. Our content approval software comparison applies that test to six tools, and the content approvals hub collects the related guides.

Next step: choose one deliverable that is currently awaiting client review. Give it an asset ID and version, name the approver, send a precise request, and record the decision in one place. Your approval process becomes real on that first item.

Questions about the approval tracker

Is the tracker a CSV file or a spreadsheet?

The download is a CSV file with a ten-column header and three blank rows. It opens in Excel, Google Sheets, Numbers or Airtable, and it carries no formulas or permissions of its own. If you want calculated reminders or alerts, build them in the tool you import it into.

Does every new version need a new row?

Yes, for any substantive change after a client has reviewed the file. A new row keeps the reviewed version, its approver and its decision intact. Typos that your agreement excludes from reapproval can be recorded as an exception in Next action rather than silently overwriting the row.

What should go in the Decision evidence column?

A link or reference to something that exists outside the tracker: the approval message, the comment thread, the signed note or the recorded call. It should let a colleague reconstruct who approved which version, on what date, without asking you. “Approved verbally” alone is not evidence.

Do I need approval software to use this template?

No. A shared document, this CSV and one review link per version are enough for a few text deliverables a month. Software becomes worth evaluating when visual files, many versions or several reviewers make the decision record hard to find. Test any tool on the same fictional asset first.

How long should approval records be kept?

The tracker does not set a retention period. Your contract, your privacy policy and the law that applies to your client determine how long to keep decision records and reviewed files. Ask the client's requirement at onboarding, write it down, and apply the same rule to exported trackers.

Our templates are editorial practice, not a certified standard. The example is fictional, and the tracker is not legal advice on approvals, retention or signatures.